Dismantling of remaining wall due to collapse and re-build using lime mortar.
WT Lambs Hand made bricks were used for the pier and levelling course along with knapped flints and galletting for the pier. We re used the original flints along with some brought in off the Southdowns. A new portland stone capitol was placed on top of the brick pier and a continuous caping along the top of the wall. Brick buttresses were built on the exterior of the wall to give additional support.